One machine –

two applications

Both applications

are possible; unbalance

correction through hori-

zontal or vertical drilling.

Your safety comes first The Distec fulfills the requirements laid down in the latest Machinery Directive 2006/42/EC, valid since the beginning of 2010, in every respect and is CE certified. The protection fulfills the standards set by the DIN ISO 21940-23.

Energy efficient concept Drill setup fixture for fast, On the Distec, modern, economic drives are used and the effective drill changing design is consistently light weight – without inefficient hydraulics and cooling devices. The energy optimised drilling unit lowers your costs and improves your return on investment. Efficiency is also a question of space: With an area of less than 4 m², it needs significantly less space than comparable solutions. For you this means: The Distec can be integrated into every production system and also saves valuable production space.